Production Order Confirmations
Hi all,
Can I confirm an operation on Production order with posting date in future.
Thx..
kdrau
Hi all,
Can I confirm an operation on Production order with posting date in future.
Thx..
No. You can't confirm an operation by future date. But you can confirm am opearion with the date in past.
Hi all,
Can I confirm an operation on Production order with posting date in future.
Thx..
No. You can't confirm an operation by future date. But you can confirm am opearion with the date in past.
An operation can be confirmed in past if CO posting periods are not locked. But I am trying to see if we can post in future.
In CO you can post cost center spendings in future I am wondering why confirmations can't be posted same way.
Any Ideas...
Thx...
kdrau
You can enter posting date in future.
Go to IMG --> production ---> shop floor control---> Operations ---> Confirmations----> Define confirmation Parameters
Go to ur order type and on " Checks " box
click on " Date In future".
Now during confirmation Enter posting date in Future.
Cheers.