ANSI tables and the SAP Dunamic Modification rule
Gurus,
Does anyone have experience of how to include the ANSI standard requirement for a number of individual units within samples into the dynamic modification rule for a stage change from normal to reduced inspection?
THere is a table in the ANSI standard that shows how many sample units must have been inspected in teh immediately preceding 10 lots before a stage change should be made, but the SAP DMR appears to be able to handle only a number of successful lots, without referenece to the number of units in the sample for each lot.
Any help will be appreciated.
Thanks,
Dennis
hi
in SAP dynamic modification is always based on lot or usage decision & not on sample .Sample size is calculated based on lot qty .Based on inspection qty rejection or accptance you can decide the quality level of inspection lot .But still it is full lot & not the qty .May be future version may come up with this .
Ram