How to Transport the P O Release Characteristic values
Hi
I have changed the characteristic values and created new PO release strateg in Dev. system. When I am trying to transport, the system is neither transporting the values to the Quality system or overwriting the old values with new values.
Very Urgent
Cheers
Sharief
My experience in managing changes in Release Procedures:
* Create class/ chars mannually in Dev/ Test and Prod clients.
* Config of Release Procedure (Rel Grp/ Code/ Strategies) can be comfortably transported.
* Then use CL20N (for Class Type 032) in Prod to assign Classification values to your release strategies.
_________________
Ajay Singh
Hi
Release strategies are transported.
But, classification values are not transported.
You have 3 options:
1) Manual as explained by ajay in his posting
2) BDC (if you have large number of strategies)
3) Configure ALE (along with your Basis ) for transporting classification
WISH YOU HAPPY NEW YEAR-2004
_________________
Br - Ramki