Scrap accounting issue

Question:
Dear all
Can anyone please tell me whether there is any way out to do scrapping without value for the material which is already having MAP.
current scenario is
we want to issue quantity but keep the value for the left stock.
Example:
100 PC on stock with MAP of 2 dollar which is total of 200 dollar
now you want scrap 50 with value zero.
Finally you have 50 on stock with value of 200, new MAP = 4 dollar.
And also, I want to retain the same value after scrapping. If it is one time affair, the same can be done vide MR21 but it is a regular affair as per business requirement.
Please be kind enough to help us on this issue as it is required urgently.
Thanks and Regards
Sanjeev
Answer:
This was discussed in two recent posts:
http://sapfans.com/forums/viewtopic.php?t=151066

http://sapfans.com/forums/viewtopic.php?t=133282

It is difficult to find standard solutions to non-standard scenario. Doesn't this overvalue the remaining stock? Why'd you load loss on account of scrap to good units?
If you want to load cost of scrap material to useful units, maybe something can be explored if you elaborate the scenario. In particular, is the material comes into stock via production order or purchase order.
_________________
Ajay Singh
Answer:
This was discussed in two recent posts:
http://sapfans.com/forums/viewtopic.php?t=151066

http://sapfans.com/forums/viewtopic.php?t=133282

It is difficult to find standard solutions to non-standard scenario. Doesn't this overvalue the remaining stock? Why'd you load loss on account of scrap to good units?
If you want to load cost of scrap material to useful units, maybe something can be explored if you elaborate the scenario. In particular, is the material comes into stock via production order or purchase order.
Material is coming through purchase order and scenario is that after process material is scrapped in process but current business scenario depands that there should not be any change in value of the material after scrap so now moving average price of material is increased.
this is the business requirement

More Articles:

Vendor Evaluation?
Purchase requisation conversion?
Transferring material from one storage location to another?
invoive value?
Advance Shipping?
BAPI to hold invoice (do not post) in MIRO?