quota: seperate veondors for very PR or between PRs
I have maintained source list and quota arrangement (btw vendor 1 and 2)for a material A.
I have a shortage for A, say 100 Pcs. MRP propose a PR, but in the PR system suggest vendor 1 (as fixed vendor) for the 100 Pcs.
Question: should the system suggest 2 PRs, one for vendor 1 and the other for vendor 2? Or the next time I have shortage for A, say 200 Pcs, then the system will suggest vendor 2, 200 Pcs?
Thanks for your help.
Hi,
Yes, this can be achievable if you are flagging 'Split Quota' indicator in the MRP Type of the material.
Cheers,
HT
_________________
Moderator:
Hi HT,
thanks for your reply. Which view do you refer to in the material master data? purchasing view (quota arr usage) or MRP 1 (MRP type)? Both place I can't find the "split quota" indicator.
Thanks in advance for your kind reply.
(quite impressed by your number of replies)
Hi,
Yes, this can be achievable if you are flagging 'Split Quota' indicator in the MRP Type of the material.
What I meant was that you should go to Transaction MM03 and define the MRP Type that you used for your material number record and then go to Transaction OMDQ where you can flag on the 'Split Quota' indicator for this MRP Type.
Cheers,
HT
_________________
Moderator:
Hi HT,
I must missout something. In tansaction OMDQ, there is no "split quota" indicator. I am using 4.7, some of the settings are:
1 MRP type M0 (similar for M1, M2, M3, M4)
MRP procedure M Master production scheduling
Firming type 0 Planning results not firmed
Roll forward Do not delete firm planned o
plan regulary
Forecast ind. * Optional forecast
Consump.ind.forecast U Unplanned consumption
MRP ind. forecast U Unplanned requirements
Reduce forecast
Automatic calculation of
safety stock
reorder point
Screen sequence 001
Planning method
2. MRP type P1 (similar for P2, P3, P4, PD)
MRP procedure D Material requirements planning
Firming type 1 Automatic firming and order propo
Roll forward Do not delete firm planned orders
Forecast ind. * Optional forecast
Consump.ind.forecast U Unplanned consumption
MRP ind. forecast U Unplanned requirements
Reduce forecast
Automatic calculation of
safety stock
reorder point
Screen sequence 001
Planning method
3. MRP type R1 (similar for R2, RE, RF, RP, RR, RS)
MRP procedure R Time-phased materials planning
Firming type
Roll forward Do not delete firm planned orders
Forecast ind. + Obligatory forecast
Consump.ind.forecast G Total consumption
MRP ind. forecast Not to be included in planning
Reduce forecast Reduce forecast value by consumption
Automatic calculation of
safety stock
reorder point
Screen sequence 004
Planning method
4. Planning type V1 (similar for V2, VB, VM)
MRP procedure B Reorder point planning
Firming type
Roll forward Do not delete firm planned orders
Include ext. reqmts 2 External reqmts within replenishment lead time
Additional requirement in reorder point planning
subcon request
order reservation
PM/network reservation
orderdelyschedule
PchReqRel
SchAgrmntDS
Forecast ind. * Optional forecast
Consump.ind.forecast G Total consumption
MRP ind. forecast Not to be included in planning
Reduce forecast
Automatic calculation of
safety stock
reorder point
Screen sequence 003
Planning method
In short, I still can't find the the "split quota" indicator
Any more clue?
Hi,
My sincere apology for this misled information. The setting should be read in Lot-sizing procedure setting via Transaction OMI4.
Cheers,
HT