Question:
Dear all
The transaction ME2N with scope list "ALLES" gives the report based on PO document date selection. We require report based on above scope list for material document date based and not on PO document date based. If a PO raised in May'04 and we have received supplies in May and June for that PO, this report gives GR and other information for the both months while we require only May'04 transactions to be displayed against that PO.
In other words, we require a Purchase day book which should be GR document based.
Kinldy help.
Thanks and Regards
Vijay
Answer:
You can enter a range for delivery date on the selection screen of ME2N.
However if the delivery date is not met, it might not give the values you want see.
If you want a report based on material document, then you should try MB51.

More Articles:

how to get the PO list which is changed during some period?
ATP check on MRP area level?
How to forbid deleteing following documents?
repair job?
Smart Form for GR printing?
Material master cleanup?