Upgrading our BW 3.0A to 3.0B
Hi all,
I’m trying to upgrade SAP BW from 30A to 30B and after 60% of the upgrade phase in ACL_620, the system wait long time.
I check the processes in the windows task manager and the CPU usage was 100% and the process oracle.exe used 99%.
What I have to do?
Thanks in advance,
Carlos Pereira
You can check the logfiles on OS level. If the time stamp of the current log file is changing from time to time, the phase is still active. I had the same problem. The ACT_620 was running for several hrs, but the logfiles were still active.
If not: As far as I remember they say what to do in the installation/upgrade guide
Greets